Service Resumes Into and Out of Grand Central

For Metro North riders.

Regular off-peak train service has resumed in and out of Grand Central Terminal with scattered delays of up to 15 minutes. The fire is under control and two of four tracks on the 138th Street Bridge have been restored. We continue to assess any damage on the remaining two tracks and its impact, if any, on the PM peak service.

It will probably be a long crowded commute home. Use this link for updates.

This entry was posted in News. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *